Back to All Featured Projects
Enterprise Engineering • Commercial HVAC

RU Central Auditorium HVAC Overhaul

Full mechanical overhaul and chemical jet decontamination of 120-ton industrial chiller systems, air duct sanitization, and automated digital thermostat integration for the 2,500-seat university auditorium.

Contact Engineering Team
RU Central Auditorium HVAC Overhaul
120 Tons Cooling Restored
4 Days Total Turnaround
-28% KWh Energy Drop
100% Convocation Uptime

The Client & Context

Client: Rajshahi University Engineering & Estate Directorate
Location: Motihar, Rajshahi
Completed: September 2026

The Operational Challenge

Prior to the university convocation, the 2,500-seat central auditorium suffered from severe cooling degradation. Heavy sand accumulation from the nearby Padma River basin had choked the cooling coils, causing dangerous compressor head-pressure spikes and excessive energy draw.

The Strategic Solution Executed

Sheba Rajshahi mobilized an engineering squad of 12 certified HVAC specialists. We deployed self-contained chemical jet cleaning trailers, flushed 120 tons of condenser and evaporator capacity, replaced worn vibration dampers, and re-calibrated the dual-stage digital thermostats with computerized load balancing.

"The Sheba Rajshahi engineering team demonstrated exemplary discipline and technical prowess. They completed the overhaul ahead of schedule, ensuring the convocation proceeded in total comfort."

Prof. Dr. M. Rahman — Director of Planning & Development, RU

Technical Specifications & Parameters

Client Organization Rajshahi University (RU)
Facility Type Academic / Convention Auditorium (2,500 seats)
Equipment Serviced 120-Ton Industrial Chiller System (Carrier / Daikin)
Scope of Work Chemical Jet Flushing, Refrigerant Balancing, Duct Sanitization
Execution Timeline 4 Days (96 Hours Continuous Shift)
Safety Certification ISO 9001 HVAC Compliance Passed